Project Portfolio

Transfer Additive Injection Skid

Date: December 31, 2012
Location: Detroit, MI

This Lane Additive Pre-Fabricated Skid is a metering, blending and top truck load out skid.
Learn More »

Adhesive Blending Equipment Relocation

Date: December 31, 2010
Location: Taylor, MI

Bullard Company relocated access platforms, pipe and storage tanks from Dayton, OH to Taylor, MI.
Learn More »

Alternate Fuels Silo Project

Date: December 31, 2010
Location: Dundee, MI

In this turnkey project - Bullard Company poured foundations and containment, set silos, erected structural steel supports and pipe bridges, installed piping, insulation and controls.
Learn More »

Modular Pipe Racks and Pipe Bridges

Date: December 31, 2009
Location: Cedar Rapids, IA

Large pipe racks support up to 27 pipelines which range in size from 2" to 36" and are built from either carbon or stainless steel.
Learn More »

Modular Rail Car Access Platform with Pipe

Date: December 31, 2009
Location: Beaumont, TX

Bullard Company is the only safe access equipment company able to reduce costs and installation risk by adding pre-installed pipe to an access platform.
Learn More »

Modular Pipe Racks and Pipe Bridges Modular Pipe Racks and Pipe Bridges

Large pipe racks support up to 27 pipelines which range in size from 2" to 36" and are built from either carbon or stainless steel.

All Projects