Bullard Company relocated equipment from Dayton, OH to Taylor, MI. Scope of work included:

  1. Demolition & concrete work for containment areas for (10) outside tanks and truck unload
  2. Installation of (10) new 15,000 gal bulk storage tanks and carbon steel piping
  3. Installation of (17) blend tanks with pipe and scales
  4. Installation of Plastisol Equipment and internal piping
  5. Fabrication and installation of 20’ x 80’ x 10’ equipment platforms
  6. Fabrication and installation of access equipment
  7. Cooling water system
  8. Pipe and Pipe Insulation (chilled water supply and return)
  9. Expanded existing air system
  10. Repair insulation on existing tanks
  11. Vacuum System
  12. Mixers
  13. Fill Station
  14. Torrit Dust Collection
  15. Hydraulics
  16. 25’ Pipe Bridge and 250’ piping


Services Used:

  • Mechanical Contracting (pipe fitters/welders)
  • Masonry Services
  • Pipe Engineering and ASME Fabrication

Products Used

« Back to Project Portfolio