Project Portfolio

Transfer Additive Injection Skid

Date: December 31, 2012
Location: Detroit, MI

This Lane Additive Pre-Fabricated Skid is a metering, blending and top truck load out skid.
Learn More »

Modular Pipe Racks and Pipe Bridges

Date: December 31, 2009
Location: Cedar Rapids, IA

Large pipe racks support up to 27 pipelines which range in size from 2" to 36" and are built from either carbon or stainless steel.
Learn More »

Adhesive Blending Equipment Relocation Adhesive Blending Equipment Relocation

Bullard Company relocated access platforms, pipe and storage tanks from Dayton, OH to Taylor, MI.

All Projects