Project Portfolio

Transfer Additive Injection Skid

Date: December 31, 2012
Location: Detroit, MI

This Lane Additive Pre-Fabricated Skid is a metering, blending and top truck load out skid.
Learn More »

Modular Pipe Racks and Pipe Bridges

Date: December 31, 2009
Location: Cedar Rapids, IA

Large pipe racks support up to 27 pipelines which range in size from 2" to 36" and are built from either carbon or stainless steel.
Learn More »

Modular Rail Car Access Platform with Pipe Modular Rail Car Access Platform with Pipe

Bullard Company is the only safe access equipment company able to reduce costs and installation risk by adding pre-installed pipe to an access platform.

All Projects