Project Portfolio

Transfer Additive Injection Skid

Date: December 31, 2012
Location: Detroit, MI

This Lane Additive Pre-Fabricated Skid is a metering, blending and top truck load out skid.
Learn More »

Adhesive Blending Equipment Relocation

Date: December 31, 2010
Location: Taylor, MI

Bullard Company relocated access platforms, pipe and storage tanks from Dayton, OH to Taylor, MI.
Learn More »

Alternate Fuels Silo Project

Date: December 31, 2010
Location: Dundee, MI

In this turnkey project - Bullard Company poured foundations and containment, set silos, erected structural steel supports and pipe bridges, installed piping, insulation and controls.
Learn More »

Modular Pipe Racks and Pipe Bridges

Date: December 31, 2009
Location: Cedar Rapids, IA

Large pipe racks support up to 27 pipelines which range in size from 2" to 36" and are built from either carbon or stainless steel.
Learn More »

Modular Rail Car Access Platform with Pipe

Date: December 31, 2009
Location: Beaumont, TX

Bullard Company is the only safe access equipment company able to reduce costs and installation risk by adding pre-installed pipe to an access platform.
Learn More »

Transfer Additive Injection Skid Transfer Additive Injection Skid

This Lane Additive Pre-Fabricated Skid is a metering, blending and top truck load out skid.